Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • Contact Us
  • Home
  • balanceAAP
  • Organizational Profile
  • Advanced Options

Sectors (Optional)

Written by Paul Gorman

Updated at December 4th, 2024

Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • balanceWORKS
  • balanceAAP
    About balanceAAP Plans Home Settings Data Help for the AAP Data Import Job Group Structure Organizational Profile Availability History IWD/Veterans Narratives Publish Plan Reports Dashboard Plan Review Additional Information System Tools (for Administrators)
  • Berkshire Client Portal
    About Berkshire Client Portal Data Visualizations Reports System Tools BCP Tools
  • REACH
    About REACH Modules System Tools
  • Release Notes
+ More

Table of Contents

Create Sectors to Organize Reporting What is a Sector? How Sectors are used About Building Sectors Add and Define a Sector View Sector Worksheet Other Sector Page Controls Search for Values Copy Sector Change Sector Name Delete Sector Import Sectors from another Plan or External File — From an Existing Plan — From an External File Complete the Import Process

Create Sectors to Organize Reporting

What is a Sector?

The Reporting Structure > Sectors module can be used to create another unit level above a Drilldown as the basis for a Reports filter. A Sector, or a cross-section of the plan, is created by grouping together available Departments (the default) or other values.

How Sectors are used

While an AAP is developed to meet specific Federal reporting requirements, many organizations also want to view results for an AAP location in other ways, as part of strategic workforce communication and planning. These reports look the same as the required AAP reports, except information will be displayed by Drilldown unit and grouped by Sector. After Sectors are defined in the system, the SECTOR WORKSHEET, described below, will display how the units are currently composed, for your review.

Example: A college or university may want to view Incumbency vs. Availability statistics, organized by Sectors (and Drilldowns) for Administration (e.g., Executive Administration, Campus Operations), Arts and Humanities (e.g., Performing Arts, Journalism), Mathematics (e.g., Applied Mathematics), and so on.

Cross-reference: Please refer to Reports > Filters for instructions on configuring filtered reporting.

About Building Sectors

First, a Sector is added to the system for display in the Sector drop-down, located in the Sectors menu header. If multiple Drilldowns were built, the Sectors page will display both Sector Name and Sector drop-downs. Once an existing Sector is selected from the drop-down(s), Departments or other values can be checked-off for inclusion in a group.

Examples: The default Department Drilldown fields can be organized by function, such as Sales, IT, Engineering, and Manufacturing. Or a Grade Drilldown can be organized into a hierarchy of pay ranges.

Add and Define a Sector

(Multiple Drilldowns) Select a Sector Name from the provided drop-down before proceeding.

Click [Add New] to open the Create Sector menu, and enter a Sector name. Click [Save] to add the Sector to the Sector drop-down menu. The added Sector will be active.

Check the box next to each Department or other value to be included. Use the All, None, All On This Page, None On This Page links to select multiple values at the same time. A message will indicate the value was added to the Sector.

View Sector Worksheet

As an aid to developing or editing Sectors, select [View Report] from the upper toolbar to open a SECTOR WORKSHEET report, which displays each Sector and component fields.

Other Sector Page Controls

Search for Values

Enter part or all of the Department code or other value into the Search field, and click Search. To clear the results, click [Clear].

Copy Sector

To create a new Sector, containing the same values as an existing one, make the existing Sector active by selecting it from the Sector drop-down. Then choose [Copy] from the upper toolbar. Enter a label when prompted (in place of the "Copy of ..." placeholder), and click [Save]. Proceed to editing what values are included in the Sector, as necessary.

Change Sector Name

Select the Sector from the upper drop-down, and choose [Change Name] from the upper toolbar. Enter the new label, and click Save.

(Multiple Drilldowns) If you created a custom Drilldown, with Sectors, return to Reporting Levels > Drilldowns to edit the Sector Name.

Delete Sector

Select the Sector from the upper drop-down, and click the [Delete] button. When the confirmation message appears, click [Yes].

Import Sectors from another Plan or External File

Click [Import], then select and Import Type:

— From an Existing Plan

Click [Next], and choose Company, Establishment, and Plan from the drop-downs.

— From an External File

The external file should include Sectors and included Departments or other values.

(Multiple Drilldowns) Each Sector Name will require a separate table, spreadsheet, or text file, containing corresponding Sector units and values.

After each step described below, click [Next].

Example: The Sector name is "Pay Range" (for organizing Grades), and the Sector units are "Level 1", "Level 2", "Level 3" and so on. Then, Level 1 is comprised of the Grade values of E1, E2, and E3.

  • Select Sectors — The default Sector and any defined on the Drilldowns tab will display. Use the [Right arrow] to include a Sector in the import.
  • Upload Files — Locate the file on your computer.
  • Match Sectors — Use the provided drop-downs and the Preview of Data. (Fields marked with an asterisk are required.)

Complete the Import Process

Select:

  • Append (Add to existing)
  • Overwrite (Replace existing)

Click [Import] to perform the process and view the results. The number of records imported and dropped will be displayed.

Then choose to:

  • Go to Sector Import (To address dropped files)
  • Go to Sector Home ( To view values included in the Sector and edit, as necessary)
unnamed text nameless piece

Was this article helpful?

Yes
No
Give feedback about this article

Related Articles

  • Rollup Verification (Master Plan only)
MicrosoftTeams-image (4)

Berkshire is a human resources and technology firm specializing in affirmative action, pay equity, and workforce data analytics.

Solutions
  • Compliance
  • Pay Equity
  • People Insights
About Us
  • History
  • Careers
  • Our Team
  • Contact Us
  • Privacy Policy

© Copyright 2024

Expand