Home
Table of Contents
Use the Home page and Plan Activities Buttons
Once a plan has been created, the plan's Home page provides access to — and brief descriptions of — the development sections and steps for creating an Affirmative Action plan. At the bottom of the page are Plan Activities buttons.
Settings |
Data |
Availability |
Organizational Profile |
History |
IWD/Veterans |
Narratives |
Publish Plan |
Reports |
Dashboard |
For a sequential outline of plan development steps, refer to: Annual AAP Checklist.
Plan Activities
Recalculate the Plan
Refresh all calculations and reports in the plan by clicking [Recalculate]. Recalculating a plan can often resolve issues that may occur with complex calculations.
Validate Data Tables
Although validation will occur automatically during plan development, you may reconcile plan Data at any time from the Home page.
Export the Plan
Click [Export All] to store or use plan settings, data, and reports outside the system. A Zip file will contain settings and tables in Excel, while reports will be formatted in PDF. This is useful for storing legacy plans before balanceAAP archives them.
Master Plan/sub plans — From the Export All menu, choose sub plans, and click the [Export] button.
Quick Tip: This operation may take some time to complete. Click [Run in Background]. Open the Notifications panel for updates on percent completed; if the process is complete, click the [Download] icon for the export. (These functions are described below.)
View Plan Log
Click [View Plan Log] to display the PLAN AUDIT report, listing the date-stamped activities that have taken place within the plan. The report can be filtered by date range and/or user ID.
Plan Lock
Click [Lock] to lock current plan and prevent all plan, data, and settings modification until plan is unlocked.